References pipeline construction

Excerpt from our reference list for pipeline construction

Pipeline for pulverized coal injection system Voest Alpine GmbH Linz
Client: E.S.C.H GmbH
Location: Linz (Austria)
Realisation: 2014

Media pipes in stainless steel, douple-walled media pipes (heated) for chocolate and pipes appropriate for milk
Client: Stollwerck GmbH (chocolate factory)
Location: Factory Saalfeld
Realisation: annual

Renewal stainless steel pipes DN 200

Client: Zweckverband Abfallwirtschaft Saale-Orla (ZASO)
Location: Pößneck
Realisation: 2013

Renewal pipeline gravel filter
Client: Stollwerck GmbH (chocolate factory)
Location: Factory Saalfeld
Realisation: 2013

Fabrication and delivery coarse dust absorbation

Client: Badische Stahl-Engeneering GmbH
Location: Kehl
Realisation: 2013

Dis- and assembly fire extinguisher pipe DN 200
Client: Stollwerck GmbH (chocolate factory)
Location: Factory Saalfeld
Realisation: 2012

Repair cooling water pipe DN 80/DN 65
Client: Stollwerck GmbH (chocolate factory)
Location: Factory Saalfeld
Realisation: 2011

Exchange 8 bend DN 600 und exchange T-piece DN 1000/900
Client: Zellstoff Stendal GmbH
Location: Arneburg
Realisation: 2011

Delivery and assembly bend DN 800
Client: Wünschendorfer Dolomitwerk GmbH
Location: Wünschendorf
Realisation: 2011

Delivery and assembly steam pipe DN 25
Client: Stollwerck GmbH (chocolate factory)
Location: Factory Saalfeld
Realisation: 2011

Exchange bend steam pipe
Client: Zellstoff Stendal GmbH
Location: Stendal
Realisation: 2011

Repair boiler house
Client: Stollwerck GmbH (chocolate factory)
Location: Factory Saalfeld
Realisation: 2010

Repair Klappstück (gate)
Client: Tenova Re Energiy GmbH
Location: Düsseldorf
Realisation: 2010

Fabrication elbow connection 135°
Client: Tenova Re Energiy GmbH
Location: Georgsmarienhütte
Realisation: 2010

Relocation douple shell pipe
Client: Stollwerck GmbH (chocolate factory)
Location: Factory Saalfeld
Realisation: 2010

Delivery electric furnance and direct suction
Client: BSW Anlagen GmbH
Location: Kehl
Realisation: 2010

Regeneration EAF lower vessel
Client: Stahlwerk Thüringen
Location: Unterwellenborn
Realisation: 2009

Delivery and assembly suction line DN 150/125
Client: Stollwerck GmbH (chocolate factory)
Location: Factory Saalfeld
Realisation: 2009

New construction filtration plant
Client: Vattenfall Cottbus
Location: Markersdorf
Realisation: 2009

Fabrication sliding sleeve
Client: BSW Anlagen GmbH
Location: Kehl
Realisation: 2009

Fabrication and delivery stainless steel container 500l
Client: Firma Thomas
Location: Weimar
Realisation: 2009

Hot gas line, sliding sleeve, turning elbow
Client: Stahlwerk Thüringen
Location: Unterwellenborn
Realisation: 2009

Relocation pipelines black and in stainless steel DN 25 – DN 200
Client: Drucklufttechnik Kühlmann GmbH
Location: Arnstadt
Realisation: 2007, 2008, 2009, 2011 and 2012

Regeneration furnance lid
Client: Stahlwerk Thüringen
Location: Unterwellenborn
Realisation: 2008

Exhaust pipelines with and without cooling and a diameter of 2,2m
Client: Stahlwerk Thüringen
Location: Unterwellenborn
Realisation: 2003, 2005, 2006, 2007, 2008 and 2012

Relocation pipelines from silo to injection tower
Client: E.S.C.H. GmbH
Location: Salzgitter
Realisation: 2007

Dis- und assembly pipes DN 50
Client: Stollwerck GmbH (chocolate factory)
Location: Factory Saalfeld
Realisation: 2007

Pressure line DN 200 for transportation of sawdust
Client: HVT Hobelspanverarbeitung GmbH
Location: Dittersdorf
Realisation: 2006 - 2007

Cooling units for non-contact measurement on steel sections
Client: Stahlwerk Thüringen
Location: Unterwellenborn
Realisation: 2006 and 2008

Presswater pipes with a diamter 108 x 12,5mm wall thickness for pressures until 120 bar
Client: Stahlwerk Thüringen
Location: Unterwellenborn
Realisation: 2003 and 2007

Feed pipe for sand, gravel in DN 40 – DN 150 with 8mm wall thickness
Client: Fa. Buderus
Location: Lollar
Realisation: 2005

Cooling water pipes
Client: Stollwerck GmbH (chocolate factory)
Location: Factory Saalfeld
Realisation: 2004 - 2005