References steel construction

Excerpt from our reference list for steel construction

Steel components for noise control enclosures in power plants
Client: BIS Gerber GmbH
Location: Delivery e.g. to Portugal, Australia, France, Spain, Siberia, Moscow, Oman
Realisation: 2005, 2006, 2007, 2008, 2009, 2011 and 2014

Dis- und assembly of portal and lifting device ladle furnance 1

Client: Badische Stahl-Engeneering GmbH
Location: Kehl
Realisation: 2013

Platform furnance hall westside
Client: Stahlwerk Thüringen
Location: Unterwellenborn
Realisation: 2013

Pipe bridge
Client: InfraLeuna GmbH
Location: Leuna
Realisation: 2013

New construction of the centre of physiotherapy
Client: mediwe GmbH
Location: Dresden
Realisation: 2013

Reconstruction Kreissparkasse (provident bank)
Client: Kreissparkasse Saale-Orla
Location: Schleiz
Realisation: 2013

Platforms for expansion bypass
Client: Eiffel Deutschland Stahltechnologie GmbH
Location: Itzehoe
Realisation: 2012

Steel construction for splash water treatment
Client: BSW Anlagen GmbH
Location: Kehl
Realisation: 2012

Steel construction for VGR Kaluga
Client: Siemens AG
Location: Delivery to Russia
Realisation: 2012

Crane runway production area
Client: Reschwitzer Saugbagger Produktions GmbH
Location: Saalfeld
Realisation: 2012

Exercise tower for the fire brigade
Client: Community Kamsdorf
Location: Kamsdorf
Realisation: 2012

Service platform for VW
Client: Remech Systemtechnik GmbH
Location: VW Wolfsburg
Realisation: 2012

Concrete template

Client: RHI Refractories Site Services GmbH
Location: Unterwellenborn
Realisation: 2012

Fabrication and delivery of steel constructions for biomass power plant
Client: Weiss Kessel-, Anlagen- und Maschinenbau GmbH
Location: Delivery to Forbach and Metz (France)
Realisation: 2011

Platform steel construction for a new glas trough
Client: HEINZ-GLAS GmbH
Location: Kleintettau
Realisation: 2011

Repair Ziemestalbridge
Client: Association Thüringer Oberlandbahn e.V.
Location: Ziegenrück
Realisation: 2011

Cable route
Client: BSW Anlagen GmbH
Location: Kehl
Realisation: 2011

Steel construction for machine frames
Client: Firma Kahl
Location: Reinbek
Realisation: 2008, 2009, 2010 and 2011

Pergola
Client: City of Neustadt
Location: Neustadt an der Orla
Realisation: 2011

Steel construction silo
Client: BASF Performance Polymers GmbH
Location: Rudolstadt
Realisation: 2011

Steel construction Städtisches Klinikum Braunschweig (hospital)
Client: Partner Bau Quedlinburg GmbH
Location: Braunschweig
Realisation: 2011

Stadiumexpansion Bata
Client: MMS Stahl- und Anlagenbau GmbH
Location: Delivery to Bata (Africa)
Realisation: 2010

Girder grid for Universitätsklinikum Düsseldorf (hospital)
Client: Cadolto Thüringen GmbH & Co. KG
Location: Düsseldorf
Realisation: 2010

Dis- and assembly girder Oszilierungseinrichtung
Client: Stahlwerk Thüringen
Location: Unterwellenborn
Realisation: 2010

Exchange slide slap
Client: Stahlwerk Thüringen
Location: Unterwellenborn
Realisation: 2010

Steel construction girder grid Klinik Saarbrücken (hospital)
Client: Cadolto Thüringen GmbH & Co. KG
Location: Saarbrücken
Realisation: 2010

Roofage foot path
Client: ALTEC Solartechnik AG
Location: Crispendorf
Realisation: 2010

Emergency stairs TU Ilmenau (university)
Client: Buchspies Metallbau und Bauschlosserei
Location: Ilmenau
Realisation: 2009

Fabrication of circular formworks
Client: M + B Betonbau GmbH
Location: Delivery to different construction site of M + B Betonbau
Realisation: 2002, 2005, 2006, 2007, 2008 and 2010

Container fabrication
Client: Cadolto Thüringen GmbH & Co. KG
Location: Saalfeld
Realisation: 2007

Load handling device for automotive industry (VW)
Client: Remech Systemtechnik GmbH
Location: Kamsdorf
Realisation: 2007

Steel construction with gantry crane for container shipment

Client: Cadolto Flohr & Söhne GmbH & Co. KG
Location: Cadolzburg
Realisation: 2007
Peculiarity: Crane with douple girder trolley

Pipe bridge in steel construction
Client: VELUX SIG
Location: Sonneborn
Realisation: 2007

Subconstruction for wood-fired plant
Client: Danpower GmbH
Location: Bad Lobenstein
Realisation: 2006

Timber framework construction for Airbus hall
Client: CORNILS GmbH
Location: Stade
Realisation: 2006
Peculiarity: Fabrication of 850t trussed rafters

Bridge construction site for access to the tunnel construction site
Client: Straßenbauamt Mittelthüringen
Location: Rudolstadt/Schaala
Realisation: 2006

Pedestrian bridge Thüringen-Kliniken (hospital)
Client: Thüringen-Kliniken
Location: Saalfeld
Realisation: 2006

Emergency stairs as a steel construction
Client: AWO
Location: Pößneck
Realisation: 2006

Steel construction for a gas-powered generator plant as well as a platform for maintenance and operation of the plant thermolysis
Client: DEUSA International GmbH
Location: Bleicherode
Realisation: 2006

Subconstruction for noise control enclosure
Client: GGP (Bertelsmann)
Location: NL Pößneck
Realisation: 2005

Transport containers made of sheet steel
Client: Zellstoff- und Papierfabrik Rosenthal GmbH
Location: Blankenstein
Realisation: 2005, 2006 and 2007

Circular formworks for the production of concret silos
Client: M + B Betonbau
Location: Bannbersch
Realisation: 2005, 2006, 2007, 2008 and 2010

Renewal of the steel substructure for the role of stages in rolling mill in two stages
Client: Stahlwerk Thüringen
Location: Unterwellenborn
Realisation: 2005 - 2006